Trench connecting to ADJACENT Building VotG6 SSR (and O.6)

Robin Reeve

φιλέω ASL אני אוהב
Staff member
Moderator
Gold Supporting Member
Joined
Jul 26, 2003
Messages
18,597
Reaction score
4,234
Location
St-Légier
First name
Robin
Country
llSwitzerland
Hi all,

Just a need of clarification about the VotG6 SSR (and cf. O.6 rule).

When a Trench is adjacent to a building, does it connect to the cellar and the ground level?

O.621 says that the connections open into Cellar level and VotG6 speaks of "all ADJACENT building/rubble Locations" : can then >1 Location of and adjacent Building hex be ADJACENT to a Trench.
 
Top