Hi all,
Just a need of clarification about the VotG6 SSR (and cf. O.6 rule).
When a Trench is adjacent to a building, does it connect to the cellar and the ground level?
O.621 says that the connections open into Cellar level and VotG6 speaks of "all ADJACENT building/rubble Locations" : can...