Joe Bordonaro
Recruit
- Joined
- Jul 16, 2019
- Messages
- 6
- Reaction score
- 0
- Country
Looking at rule B 8.41 (Sewer), and rule B 23.9221 (Breach), and rule B 23.9 (Fortified Building), it appears that a unit in a Sewer Location can use the Advance Phase to advance into the Manhole Location above it, even if an enemy unit is in that Location, even in a Fortified Building, if that Fortified Building Location was breached at some point earlier in the game. Is that a correct interpretation of the rules that apply in this situation?