Wire and Sewers

commissar1969

Member
Joined
Oct 17, 2011
Messages
543
Reaction score
209
Location
Martin, TN
Country
llUnited States
A unit emerges from a Sewer location to Ground Level Location (an intersection of 3 roads). There is a Wire counter in the Ground Level Location. Is the Unit placed above or beneath the Wire?
 

klasmalmstrom

Forum Guru
Joined
Feb 26, 2003
Messages
19,817
Reaction score
7,252
Location
Sweden
Country
llSweden
A unit emerges from a Sewer location to Ground Level Location (an intersection of 3 roads). There is a Wire counter in the Ground Level Location. Is the Unit placed above or beneath the Wire?
Above I believe - B26.4: "...However, when entering a Wire Location (regardless of phase), they are placed on top of the Wire counter..."
 
Top