Cult.44
Senior Member
Dusting off an old design, I'm trying different boards including the venerable board 22 (along with the not-so-venerable 79). I want the multi-hex building at 22G4 to have a tower section at H4 which would have a Level 2 location while the other hexes would only have Level 0 & 1 locations (keeping the stairwells). Here's how I wrote the SSR:
"22H4 is the only hex of building 22G4 that has a Level 2 location. All other hexes of the building have Level 0 and 1 locations and are considered Level 1 1/2 LOS obstacles."
Is this clear enough? Is it necessary to mention the stairwells? Any ambiguities I'm not seeing?
"22H4 is the only hex of building 22G4 that has a Level 2 location. All other hexes of the building have Level 0 and 1 locations and are considered Level 1 1/2 LOS obstacles."
Is this clear enough? Is it necessary to mention the stairwells? Any ambiguities I'm not seeing?