johnl
Senior Member
Sirs and (possibly, but not likely) Ladies:
Consider moving a truck from Y3 to Y4. The RR Movement Point Chart for EmRR sez crossing a RR hexside not using a RR Crossing is 6MP+COT. Is the COT for a vehicle moving onto a Hillock (1MP F6.3) included in the 6MP so the COT would be (a) 1MP [OG] for 7MP total or, (b) 2MP [moving onto Hamada] + [OG] for 8MP total?
Consider moving a truck from Y3 to Y4. The RR Movement Point Chart for EmRR sez crossing a RR hexside not using a RR Crossing is 6MP+COT. Is the COT for a vehicle moving onto a Hillock (1MP F6.3) included in the 6MP so the COT would be (a) 1MP [OG] for 7MP total or, (b) 2MP [moving onto Hamada] + [OG] for 8MP total?