Search results

  1. J

    Berlin Variant Rules Clarification - HIP Interior Wall Breaches [BVR34]

    Cross-posted from ASL Rules & Errata: BVR34 in the Berlin: Fall of the Third Reich / Tyrant's Lair rules (Critical Hit) allows for secretly recorded hidden breach locations in "any hex containing an interior wall that begins within a side's setup area". I'm wondering if the definition of...
  2. J

    BVR34 - HIP Interior Wall Breaches [CH: Berlin]

    BVR34 in the Berlin: Fall of the Third Reich / Tyrant's Lair rules (Critical Hit) allows for secretly recorded hidden breach locations in "any hex containing an interior wall that begins within a side's setup area". I'm wondering if the definition of interior walls extends to connected Partially...
Top